Letters: Needless losses
Several times a year, we lose power out here. Very seldom is it weather related.
It is mostly birds of prey, shorting out the service and being electrocuted in the wires.
This wire lead was changed in the ’70s. New poles and wire installed. PG&E removed the cross arms and placed the wires, one on top, and one on each side, of the pole.
EPS Machine EPS Cutting…
EPS Machine Eps Raw…
EPS Machine EPS Recycling…
EPS Machine EPS Mould;
EPS Machine EPS Block…
EPP Machine EPP Shape…
EPTU Machine ETPU Moulding…
EPS Machine Aging Silo…
EPTU Machine ETPU Moulding…
EPS Machine EPS and…
EPS Machine EPS and…
AEON MINING AEON MINING
AEON MINING AEON MINING
KSD Miner KSD Miner
KSD Miner KSD Miner
BCH Miner BCH Miner
BCH Miner BCH Miner